I have an area where I need to push a fill slope past the existing ground at one point where there is an existing stone wall that will be removed. It then needs to tie into the same existing ground at a lower point. In my end condition exception I am defining 1 point (LFill1) @ a slope of 1.5:1 and vertical constraint of -5'. I do not have Check for interseption or Place point at interception checked but the point stops at the first instance of existing ground. I then have a second point to start at LFill1 go down @ 1.5:1 vertical -5' and construct point at interception checked on. How can I accomplish this?
Microstation v8i SS3 update 1 InRoads v8i SS2.