In PowerGeopak 08.11.09.674, even though I can see that GPK_PROJMGR_PROJECTDIR is set to the proper directory when looking at the configuration variables, if I launch Project Manager, it completely ignores this and loads the last PRJ file I was in. Has this variable been depreciated in SS3? or is there an additional switch that needs to be set? The goal is that a user should simply need to select a project when launching PowerGeopak, and not have to navigate to the correct location from inside Project Manager.
↧