I'm trying to figure out how to get the above quantities from the End-Area Volumes tool in OpenRoads. Is it possible to do this all with a single template?
How can I create a component for the 1:1 side slope of the subgrade cut (grey dashed line) that targets either the bottom of the proposed topsoil (top example) or the bottom of the existing topsoil (bottom example)?
In both cases, some of the cut area also needs to be filled (the area behind the back of curb, above the subbase & subgrade side slope, and below the proposed topsoil or removed topsoil. Will the earthwork volume report reflect this?