i have a bunch of drainage structures (inlets. MHs), some of them are outside of our proposed road work. I need to set the ones within roadwork limits to the new dtm(s). The structures outside the limits will stay as in (existing). When i modify them using the upstream of, downstream of, or tree containing options, it appears that the ones outside of the limit of active dtm picks up random values. is there any way to prevent this? Merging dtms to create a composite dtm is not an option for us at this time.
There is a selection set option in move structures that does not seem to pick up selections based on drainage queries. is there any way to just single pick structures at a time and attach them to new dtm?