Hello,
Could you help me with achieving three decimal figures accuracy in my corridor volumes report (for areas and for volumes)?
For my current corridor I have noticed that the information for the end areas is not to three decimal figures (ie surfacing should equate to 0.030 x 3.7 = 0.111 not 0.100). This applies equally to all other elements and may introduce unwanted errors in the analysis.
I have tried changing my corridor's design stage from 'desgn' to 'final' but it didn't help.